About

Manufacturing & Quality

Our manufacturing, workshop and operational base is located in the Velimeşe Organized Industrial Zone (Velimeşe OSB), Ergene, Tekirdağ, Türkiye — supported by the wider Turkish industrial base and DNG Group logistics capability.

Image: technical visualization

What we do

  • Technical production planning
  • Supplier coordination
  • Structural component preparation
  • Quality control before dispatch
  • Packaging and export documentation
  • Installation coordination

Indicative planning

Manufacturing for selected configurations takes approximately 20 days. Logistics depend on the destination, and installation of suitable small projects often takes around one week. These are planning references, not guaranteed lead times.

Planning a padel project?

Share your project details and receive a project-specific quotation.