Resources
Installation & Foundation Guide
A level, well-drained concrete slab is the basis of every permanent padel court.
Steps
- Site survey and soil assessment
- Excavation and compacted base
- Gravel layer
- Reinforced concrete slab (C25 reference)
- Drainage slope as specified
- Curing before installation
- Court installation
Reference quantities
For a standard 10 × 20 m court: ≈40 m³ concrete, ≈45 m³ gravel, ≈600 kg rebar, ≈200 m² mesh. Confirm with a local engineer.
Planning a padel project?
Share your project details and receive a project-specific quotation.
